Over the years, the Silvers' 1950s
split-level home - located just
north of Route 2 near the Dallin
School in Arlington - gave
them little trouble. But recently,
they decided some major
improvements were in order. The
roof and heating system needed to be replaced,
and the exterior paint job was on its last legs.
In addition, extra living and storage space had
long been on their wish list.
As the design phase of their latest remodeling
project began, the Silvers translated their ideas
into preliminary sketches. With the sketches as
a starting point, they exchanged ideas with
Custom Contracting president Bill Farnsworth
on a regular basis, often sending PDFs via
email.
Copyright © 2012 Custom Contracting. All Rights Reserved. | Maintained by Greatson Media | Site Map | Contact Us


